Future Projects
December 17, 2015
In Progress
- Fix Billboard HTTPS slide error – Daniel
- Cronjob descriptions for Playbook – Daniel
- SC Data Security Classification Wizard (ColorMyData) – Lark – Waiting for Security & Compliance meeting
- WRAP EOL 2015 – transition apps to Shib OT Auth adaptor- Lark
- Web Registry changes for inators – Lark
- LawBooks prototyping/Alpha – Lark
- Contact Chris Webster about Firefox plugin and Aerial business rule error in Aerial – Dan
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Roku and Apple TV streaming app channel for WolfBytes sports – waiting for streams to be available
- Update Today widget and Home Screen widget with sports scores – Dan and Jonathan
- Review MicroExplorer3D for iOS and Android – Dan
- Review and publish VCL go for iOS – Dan
- Fix Dining API cronjobs – Dan
- Research Google API changes – Lark
On Hold
- Drupal Shib research on CPanel – Daniel & Lark
- Committee on Committees PDF changes – Lark
- Set meeting with Service Now team and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- Committee on Committees changes – Lark – Done
- Met with Serena to transition web accessibility scanners – Lark
- Package and test Kaspersky 10.x for OS X – Everette
- Create Github repository for SVN Cronjobs – Lark
- Wolfpack sports score JSON feed work for On Campus and Watch complications – Dan
- Contact Athletics about JSON authorization – Dan
- On Campus Android calendar work – Jonathan
- On Campus Android Home Screen widget – Jonathan
- On Campus Android code deprecations fixed – Jonathan
- DELTA mobile app consulting meeting – Dan
- MyTech mobile app for iOS and Android published – Dan
- Met with UNC contact about iBeacon – Dan
- Add university Housing to On Campus iOS app -Dan
- Built Net Install image for El Capitan 10.11.2
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Daniel/Lark
- Interview for student developer position
December 3, 2015
In Progress
- Fix Billboard HTTPS slide error – Lark
- SC Data Security Classification Wizard (ColorMyData) – under review by Security & Compliance
- WRAP EOL 2015 – transition apps to Shib – Lark
- Committee on Committees changes – Lark – Under review by client
- LawBooks prototyping/Alpha – Lark
- Contact Chris Webster about Aerial business rule error in Aerial
- On Campus Swift rewrite – on going
- Wolfpack sports score JSON feed work for On Campus and Watch complications – Dan
- Contact Athletics about JSON authorization – Dan
- WatchKit support for On Campus – Dan – on-going
- Roku and Apple TV streaming app channel for WolfBytes sports – Nov. 15th streams available
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Daniel/Lark
- On Campus Android calendar work – Jonathan
- Review MicroExplorer3D for iOS and Android – Dan
- DELTA mobile app consulting meeting – Dan
- Web Registry changes for inators – Lark
- Create Github repository for SVN Cronjobs – Lark
- Package and test Kaspersky 10.x for OS X – Everette
On Hold
- Drupal Shib research on CPanel – Daniel & Lark
- Committee on Committees PDF changes – Lark
- Set meeting with Service Now team and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- Reviewed VCL Go iOS for submission. Returned for submission graphics – Dan
- Reviewed and returned to developer for a fix MyTech iOS and Android apps – Dan
- Android map search for OnCampus – Jonathan
- Released On Campus update for Android with map search fix
- Lunch-n-Learn for Getting Started in Cloud Development – Lark
- Mid-year reviews – Everette
- Fixed Web Comm Social Media Plugin approval issue
- Apple Research Kit Lunch and Learn – Everette
- Met with Tim regarding Web registry patches – Lark
November 5, 2015
In Progress
- Fix Billboard HTTPS slide error – Lark
- SC Data Security Classification Wizard (ColorMyData) – under review by Security & Compliance
- WRAP EOL 2015 – transition apps to Shib – Lark
- Committee on Committees changes – Lark
- LawBooks prototyping/Alpha – Lark
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- Wolfpack sports score JSON feed work for On Campus and Watch complications – Dan
- Contact Athletics about JSON authorization – Dan
- WatchKit support for On Campus – Dan – on-going
- Roku and Apple TV streaming app channel for WolfBytes sports – Nov. 15th streams available
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Daniel/Lark
- Review VCL Go iOS for submission – Dan
- Review MyTech iOS and Android apps – Dan
- Android map search for OnCampus – Jonathan
- Set up Lunch-n-Learn for Getting Started in Cloud Development – Lark
- Web Registry changes for inators – Lark
- Create Github repository for SVN Cronjobs – Lark
- Package and test Kaspersky 10.x for OS X – Everette
- Mid-year reviews – Everette
On Hold
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- GoLinks Campus Enterprise Tag changes INC2563064– Lark
- Working with JAMF on 500 errors on nc.jamfcloud.com – Waiting on update for prod
- Android setup and tutorials – Jonathan
- Apple Map ground truthing for Centennial Campus – Dan/Everette
- Packaged Identity Finder for OS X and tested – Everette
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – project abandoned
- SSL fixes to cron jobs
October 29, 2015
In Progress
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- SC Data Security Classification Wizard (ColorMyData) – under review by Security & Compliance
- WRAP EOL 2015 – transition apps to Shib – Lark
- Committee on Committees changes – Lark
- LawBooks prototyping/Alpha – Lark
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- Wolfpack sports score JSON feed work for On Campus and Watch complications- Dan
- WatchKit support for On Campus – Dan – on-going
- Roku and Apple TV streaming app channel for WolfBytes sports – Nov. 15th streams available
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Daniel/Lark
- Working with JAMF on 500 errors on nc.jamfcloud.com
- Review VCL Go iOS for submission – Dan
- Review MyTech iOS and Android apps – Dan
- Android setup and tutorials – Jonathan
- Set up Lunch-n-Learn for Getting Started in Cloud Development – Lark
- Web Registry changes for inators – Lark
On Hold
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- SSL transition for OT websites – Nov. 2, 2015 deadline – Lark
- SC Data Security Classification Wizard (ColorMyData) – deploying to Google App Engine
- WebRegistry social media plugin text changes – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Scheduled Web Application Security Standard presentation for Co-working for Oct. 23rd.
- Received LawBook example dataset for review
- Test for iOS 9.1 compatibility for OnCampus and webFramz
- Web registry Social Media plugin live in production – Dan
- Met with Code 42 about Crash Plan training and lunch-n-learn – Everette
- Attended FBI CyberSecurity event
- Taught iOS Security Lunch-n-Learn – Everette
October 22, 2015
In Progress
- SSL transition for OT websites – Nov. 2, 2015 deadline – Lark
- SC Data Security Classification Wizard (ColorMyData) – deploying to Google App Engine
- WRAP EOL 2015 – transition apps to Shib – Lark
- Committee on Committees changes – Lark
- Drupal Shib research on CPanel – Daniel & Lark
- WebRegistry social media plugin text changes – Dan
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku and Apple TV streaming app channel for WolfBytes sports – Nov. 15th streams available
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Dan/Lark
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Scheduled Web Application Security Standard presentation for Co-working for Oct. 23rd.
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- Received LawBook example dataset for review
- Review VCL Go iOS for submission – Dan
- Review MyTech iOS and Android apps – Dan
- Test for iOS 9.1 compatibility for OnCampus and webFramz
- Android setup and tutorials – Jonathan
On Hold
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- UNC Cause 2015
- Finished and presented at UNC Cause 2015 – Lark
- System wide software sharing automation – AutoPKG – on-going
- Added 10 social media account types to WebRegistry social media plugin – Dan
- Fixed mobile.ncsu.edu PHP upgrade deprecation
- Identified root cause with JAMF on policy rerun errors on nc.jamfcloud.com
- Jonathan on the job
- Created push notifications certificate for student media app
- Discussed application design and security for APIs
- Fixed WebRegistry permission issues
- Recovery from electrical surge issues
- Closed part-time job listing
- Attended FBI Cyber Squad presentation
- Consulted with JAMF for product features
October 8, 2015
In Progress
- SSL transition for OT websites – Nov. 2, 2015 deadline – Lark
- SC Data Security Classification Wizard (ColorMyData) – deploying to Google App Engine
- WRAP EOL 2015 – transition apps to Shib – Lark
- Committee on Committees changes – Lark
- System wide software sharing automation – AutoPKG – on-going
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku and Apple TV streaming app channel for WolfBytes sports – Oct. 15 streams available
- Work on presentations for UNC Cause 2015 – Lark
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Dan/Lark
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Web Application Security Standard presentation for Co-working for Oct. 23rd.
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- Working with JAMF on policy rerun errors on nc.jamfcloud.com
On Hold
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- UNC Wide Casper Integration
- Get D Sink to talk to web developer’s about new web application security standard in mid-Sept 2015. – Lark
- Call back candidates for part-time position
- Hired Jonathan as student temp
- Attended IT Accessibility Coordinator candidates presentations.
- Added Tags navigation item to GoLinks
- Taught OS X Management Course – Everette
- Casper Upgrade to v9.8.1 – Everette
- CrashPlan Upgrade to v4.3.4 – Everette
- Met with CrashPlan representatives
- Removed Google Compute Engine instance of Jenkins
September 24, 2015
In Progress
- SC Data Security Classification Wizard (ColorMyData) – in development
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline – Lark
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- System wide software sharing automation – AutoPKG – on-going
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku and Apple TV streaming app channel for WolfBytes sports – Oct. 15 streams available
- Work on presentations for UNC Cause 2015 – Lark
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Dan/Lark
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Get D Sink to talk to web developer’s about new web application security standard in mid-Sept 2015. – Lark
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- Working with JAMF on policy rerun errors on nc.jamfcloud.com
- Call back candidates for part-time position
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
Completed
- Schedule candidate for interview for part-time position
- Interviewed candidate for part-time position
- OSX Management course prepared and taught – Everette
- iOS Security course prepared and taught – Everette
- Fixed a iOS provisioning profile for CSC – Dan
- Casper Suite Enterprise server upgrade
- Developers Day Camp – Dan/Lark
- tvOS API research
- webFramZ for iOS went live in Apple Store
September 17, 2015
In Progress
- SC Data Security Classification Wizard (ColorMyData) – in development
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- System wide software sharing automation – AutoPKG – on-going
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline – Lark
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku and Apple TV streaming app channel for WolfBytes sports – Oct. 15 streams available
- Work on presentations for UNC Cause 2015 – Lark
- Turn Cron descriptions into a Cron Job Playbook as we update each projects code – Dan/Lark
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Get D Sink to talk to web developer’s about new web application security standard in mid-Sept 2015. – Lark
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Schedule candidate for interview for part-time position
- OSX Management course preparation – Everette
- iOS Security course preparation – Everette
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- Working with JAMF on policy rerun errors on nc.jamfcloud.com
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Completed
- Deployed GoLinks – bug fixes on statistics downloads and GoLink delete – Lark/Daniel
- webFramZ submitted to Apple for review – Dan/Everette
- Complete and add descriptions to Cronjob inventory – Daniel
https://docs.google.com/document/d/1m8BicVzRZJfH4N9Zcy7Nh3oH8UTISwIJ-aIOd94Ktjg/edit - Review applications for part-time position- Dan, Lark, Everette
- Attended Amazon Underground web presentation – Dan
- Taught Intro to Casper course – Everette
- Consult with Katie on HTTPS issues with portal – Everette
- Crash Plan roadmap meeting – Everette/Dan
September 10, 2015
In Progress
- Test GoLinks in stage – bug fixes on statistics downloads and GoLink delete – Lark/Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- System wide software sharing automation – AutoPKG – on-going
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline -waiting on Charles B.
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- webFramZ beta updates – Dan/Everette
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku and Apple TV streaming app channel for WolfBytes sports – waiting on BJ
- Work on presentations for UNC Cause 2015 – Lark
- Complete and add descriptions to Cronjob inventory – Daniel
https://docs.google.com/document/d/1m8BicVzRZJfH4N9Zcy7Nh3oH8UTISwIJ-aIOd94Ktjg/edit - Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Get D Sink to talk to web developer’s about new web application security standard in mid-Sept 2015. – Lark
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Review applications for part-time position- Dan, Lark, Everette
- OSX Management course preparation – Everette
- iOS Security course preparation – Everette
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
- Working with JAMF on policy rerun errors on nc.jamfcloud.com
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Completed
- Netinstall configuration setup for old digital signage – Everette
- Viewed Apple Hardware Event
September 3, 2015
In Progress
- Test GoLinks in stage – bug fixes on statistics downloads and GoLink delete – Lark/Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- System wide software sharing automation – AutoPKG – on-going
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline -waiting on Charles B.
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- webFramZ beta updates – Dan/Everette
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – testing feeds
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Work on presentations for UNC Cause 2015 – Dan/Lark
- Complete and add descriptions to Cronjob inventory – Daniel
https://docs.google.com/document/d/1m8BicVzRZJfH4N9Zcy7Nh3oH8UTISwIJ-aIOd94Ktjg/edit - Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Get D Sink to talk to web developer’s about new web application security standard in mid-Sept 2015. – Lark
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Review applications for part-time position- Dan, Lark, Everette
- OSX Management course preparation – Everette
- Netinstall configuration setup for old digital signage – Everette
- Working with JAMF on 500 errors on nc.jamfcloud.com
- GoLinks Campus Enterprise Tag changes INC2563064– Daniel/Lark
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Completed
- URL Link Loop for developers.ncsu.edu – removed theme with competing loop
- Data matrix for LawBooks – Everette
- Move OIT People code from AFS to Github – Lark
- Work on permissions for Social Media plugin with Luis – Dan
- Research Lawncare Android support question – Dan
- webFramZ review for beta release – Dan/Everette
- Met about API with Clean Energy Center- Lark
- Reviewed and published Student Media app update iOS
- Student iOS developer licenses requests – Referred to CSC
August 27, 2015
In Progress
- Test GoLinks in stage – bug fixes on statistics downloads and GoLink delete – Lark/Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- URL Link Loop for developers.ncsu.edu
- Data matrix for LawBooks – Everette
- Set meeting with Andrew and Lark for LawBooks and ServiceNow discussion – Everette
- System wide software sharing automation – AutoPKG – on-going
- Move OIT People code from AFS to Github – Lark – in progress
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline
- Drupal Shib research on CPanel – Daniel & Lark
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – waiting for Athletics
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Work on presentations for UNC Cause 2015
- Complete and add descriptions to Cronjob inventory – Daniel
https://docs.google.com/document/d/1m8BicVzRZJfH4N9Zcy7Nh3oH8UTISwIJ-aIOd94Ktjg/edit - Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Review applications for part-time position
- Work on permissions for Social Media plugin with Luis – Dan
- Research Lawncare Android support question – Dan
- webFramZ review for release – Dan/Everette
- OSX Management course preparation – Everette
- Netinstall configuration setup for old digital signage – Everette
- Meet about API with Clean Energy Center- Lark
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Completed
- Increase LDAP query limit for OCCReader to 1500- INC2559955
- Diagnosing Cron error issues with Web registry lock files and network issues
- Changes to text for Cyclone – in Stage testing – Lark
- Ariel MySQL db access for Ron B’s heat map app – send to Brian B.
- Request Apple to update campus map data – Expect by Nov 2015
- Drupal Google Authentication research, test with 2-factor – Daniel
- Post part-time work positions – Dan
- Reviewed Student Media iOS app and submitted to Apple- Dan
- Removal of sites from accessibility scanner – Lark
- Moved to occreader from ldapreader for mobile api ldap access
- Fixed HDMI cable issue in Holiday Hall – Everette
- webFramZ integration with iCloud, license and icon – Dan
August 20, 2015
In Progress
- Test GoLinks in stage – bug fixes on statistics downloads and GoLink delete – Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- Changes to text for Cyclone – in Stage testing – Lark
- System wide software sharing automation – AutoPKG – on-going
- Move OIT People code from AFS to Github – Lark – in progress
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline
- Drupal Shib research on CPanel – Daniel & Lark
- Request Apple to update campus map data – on-going – request status – Dan
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – waiting for Athletics
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Drupal Google Authentication research, test with 2-factor – Daniel
- Work on presentations for UNC Cause 2015
- Complete and add descriptions to Cronjob inventory – Daniel
https://docs.google.com/document/d/1m8BicVzRZJfH4N9Zcy7Nh3oH8UTISwIJ-aIOd94Ktjg/edit - Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Post part-time work positions – Dan
- Review Student Media iOS app – Dan
- Work on permissions for Social Media plugin with Luis – Dan
- Research Lawncare Android support question – Dan
- Removal of sites from accessibility scanner – Lark
- webFramZ updates for iCloud, icon and license – Dan
- OSX Management course preparation – Everette
- Netinstall configuration setup for old digital signage – Everette
On Hold
- OCC WordPress Theme Buddypress work – test and move to production – Daniel/Lark (GAE deployment)
- GoLinks testing with OTF Shib Auth adapter
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Completed
- Reviewed VCL Go iOS app and suggested changes – Dan
August 13, 2015
In Progress
- Increase LDAP query limit for OCCReader to 1500- INC2559955 – Waiting on Tim again
- Diagnosing Cron error issues with Web registry lock files and network issues
- Test GoLinks for push to Prod on August 2015 – interface changes – Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- Changes to text for Cyclone – Lark
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark – in progress
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline
- GoLinks testing with OTF Shib Auth adapter – on-going
- Request Apple to update campus map data – on-going
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – waiting for BJ
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Drupal Google Authentication research, test with 2-factor – Daniel
- Drupal Shib research on CPanel – Daniel & Lark
- Work on presentations for UNC Cause 2015
- Add descriptions to Cronjob inventory – Daniel
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Post part-time work positions – Dan
- Review VCL Go iOS app and set up public Beta testing- Dan
On Hold
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Business process for commercialization of apps – waiting on OTT – Everette and Dan
Complete
- Service Now Fuji API test – Lark
- Semester reset for Cyclone
- Reviewed and Published Delta MyTech Android app – Dan
- Lark attended Laracon 2015
- Push MobileAPI Weather fix to Staging
- MacTech and MacPolicy completed – Everette
- Watched presentations from PSU MacAdmin – Everette
- Scheduled to teach Casper training course for September 17, 2015 – Everette
- Responded to genereal On Campus app emails
- Fixed UComm permissions for Social plugin in Staging
- Updated WebFramZ iOS app
August 6, 2015
In Progress
- Service Now Fuji API test – Lark
- Increase LDAP query limit for OCCReader to 1500- INC2559955
- Diagnosing Cron error issues with Web registry lock files and network issues
- Test GoLinks for push to Prod on August 2015 – interface changes – Daniel
- SC Data Security Classification Wizard (ColorMyData) – in development
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in development
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark – in progress
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline
- GoLinks testing with OTF Shib Auth adapter – on-going
- Request Apple to update campus map data – on-going
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going – working on clean up
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – waiting for BJ
- Consulting with DASA on Trio app to determine viability – waiting for DASA – Dan
- Drupal Google Authentication research – Daniel
- Work on presentations for UNC Cause 2015
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Add descriptions to Cronjob inventory – Daniel
- Business process for commercialization of apps – on-going – Everette and Dan
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
- Review Delta MyTech Android app for review – Dan
- Lark at Laracon 2015 next week – out all week
- Post part-time work positions
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Contact Apple Indoor Navigation – Dan – waiting on Apple to release
- Check with Library about Apple Watch loan – Dan
- CAL15 storyboards and milestones – waiting on grad students
Complete
- Golinks deployed to stage and access to Golinks DB
- Casper Suite 9.7.3 hot fix applied
- Participated in telephone interviews for Accessibility Coordinator – Everette
- MyTech iOS app approved and published
July 30, 2015
In Progress
- Service Now Fuji API test – Lark
- Increase LDAP query limit for OCCReader to 1500- Waiting for Tim
- Diagnosing Cron error issues with Web registry lock files and network issues
- Test GoLinks for push to Prod on August 2015 – Daniel – waiting DB to be added in PHPMyAdmin
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Still waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in progress
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark – in progress
- WRAP EOL 2015 – transition apps to Shib
- SSL transition for OT websites – Nov. 2, 2015 deadline
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – on-going
- Request Apple to update campus map data – on-going
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan – waiting for BJ
- Consulting with DASA on Trio app to determine viability – Dan
- Drupal Google Authentication research – Daniel
- CAL15 storyboards and milestones – waiting on grad students
- Work on proposals for UNC Cause 2015
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Continue to monitor Cron Job errors
- Add descriptions to Cronjob inventory – Daniel
- Business process for commercialization of apps – on-going – Everette and Dan
- Mobile.ncsu.edu update for app security and author maintenance guidelines – Dan
- Schedule Mobile app review/brainstorm session for co-working in September 2015 – Dan
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
Complete
- Changed owner of 632 UC GoLinks to Luis Chacon
- Met with Greg Kraus about accessibility scanner
- Android On Campus update released
- Tried to implement Android Studio but had to switch back to Eclipse
- Updated and released MobileAPI for Dining On The Oval hours fix
- OS X Netinstall image updates – Everette
- Github Account notice on ot.ncsu.edu for reporting bugs – Lark
- Mobile Committee meetings regarding bad apps policy July 30th & branding July 10th
- Delete Redmine instance from Control Panel July 30, 2015 – Lark
- Attended IT Community forum – all
July 23, 2015
In Progress
- Test GoLinks for push to Prod on late July 2015 – Daniel – waiting DB to be added in PHPMyAdmin
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in progress
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark – in progress
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – waiting on response from Apple
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Meet July Mobile Committee meetings regarding bad apps policy July 30th & branding July 10th
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan
- Drupal Google Authentication research – Daniel
- CAL15 storyboards and milestones – waiting on grad students
- Delete Redmine instance from Control Panel July 15, 2015 – Lark
- Work on proposals for UNC Cause 2015
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Continue to monitor Cron Job errors
- Add descriptions to Cronjob inventory – Daniel
- Business process for commercialization of apps – on-going – Everette and Dan
- OS X Netinstall image updates – Everette
- Github Account notice on ot.ncsu.edu for reporting bugs – Daniel
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
Complete
- Reviewed all iOS apps for iOS 9 compatibility and notified developers of issues
- Inventory Cron jobs
- Helped Luis will Web Registry Social Plugin configuration – Dan
- Webregistry fixed William Setzer preferred email address
- Business Process for Commercialization of Apps Meeting with Tech Transfer
- Reviewed and Submitted for Publishing the NCSU MyTech app
- Casper Suite 9.73 upgrade on nc.jamfcloud.com
July 2, 2015
In Progress
- Test GoLinks for push to Prod on late June 2015 – Daniel – waiting DB to be added in PHPMyAdmin
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Waiting on Tim/Jason
- Look at creating OTF auth adaptors for shib & oauth2 – in progress
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark – in progress
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – waiting on response from Apple
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Meet July Mobile Committee meetings regarding bad apps policy July 30th & branding July 10th
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan
- Drupal Google Authentication research – Daniel
- CAL15 storyboards and milestones – in progress
- Delete Redmine instance from Control Panel July 15, 2015
- Submit proposals for UNC Cause 2015
- Inventory Cron jobs – Daniel – in progress
- Roku streaming channel for WolfBytes sports – waiting on BJ
- Continue to monitor Cron Job errors
- Everette out – 7/3 – 7/13
- Helped Luis will Web Registry Social Plugin configuration – Dan
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
Complete
- Reviewed and Published LawnCare Android app
June 18, 2015
In Progress
- Test GoLinks for push to Prod on late June 2015 – Daniel
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Waiting on Tim
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel/Lark (GAE deployment)
- Move SVN repos to Github – Daniel/Lark
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – waiting on response from Apple
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Meet July Mobile Committee meetings regarding bad apps policy & branding – Dan
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan after June 9th – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan
- Drupal Google Authentication research – Daniel
- CAL15 research
- Delete Redmine instance from Control Panel July 15, 2015
- Submit proposals for UNC Cause 2015
- Reviewed and Published LawnCare Android app
- Inventory Cron jobs – Daniel
- Roku streaming channel for WolfBytes sports
- Continue to monitor Cron Job errors
- Everette out – 6/22 – 7/1
- Dan – 6/19 – 6/26
- Lark half-day at 1pm 6/19
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
- webFramZ iOS – on-going
Complete
- CrashPlan Service Upgrade to 4.1.6.3
- Redmine decommissioned (turned off) June 11, 2015
- Decommission Redmine by June 2015 – need to dump database as backup – Lark
- Decommission Redmine by June 2015 – need to move stakeholders over to Github teams – Daniel
- GoLinks deployed to Stage on June 11,2015
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
- Move open issues from Redmine to Github – Daniel Done May 21
- Integrating Deploy hooks into Jenkins from github.ncsu.edu
- Met with graduate students CAL15 project initial discussions
- Lark to PHPTek May 18-22, 2015
- Year end performance appraisals moved to 5-27 – Everette
- Student Project on Calendars – Evaluate proposal
- AFNetworking library upgrade for On Campus – In submission
- Dining app features – In submission
- Drupal in Google App Engine – Google Cloud Launcher
- VLC One-Click app Certs and Provisioning – Dan
- Webregistry fix – Generic accounts, groups white screen
- Cyclone cronjob fix – missing access rights
- Email stakeholders for each application to inform of GitHub move – Lark
- Update ot.ncsu.edu projects with Report Issue link for each project – Daniel
- Determine if insecure Android apps can be removed from Play store – contact campus developers – apps removed – Dan
- Added UPS battery, iPad Air, and Nexus 6 to end of year list
June 11, 2015
In Progress
- Test GoLinks for push to Prod on late June 2015
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Waiting on Tim
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – in progress – Daniel
- Email stakeholders for each application to inform of GitHub move – Lark
- Update ot.ncsu.edu projects with Report Issue link for each project – Daniel
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – waiting on response from Apple
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Schedule July Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan after June 9th – Dan
- Talk to BJ about Wolfpack sports scores for Apple Watch complications – Dan
- Drupal Google Authentication research – Daniel
- webFramZ iOS – on-going
- CAL15 research
- Determine if insecure Android apps can be removed from Play store – contact campus developers – Dan
- Delete Redmin instance from Control Panel July 15, 2015
- Submit proposals for UNC Cause 2015
- Review LawnCare Android update
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
Complete
- CrashPlan Service Upgrade to 4.1.6.3
- Redmine decommissioned (turned off) June 11, 2015
- Decommission Redmine by June 2015 – need to dump database as backup – Lark
- Decommission Redmine by June 2015 – need to move stakeholders over to Github teams – Daniel
- GoLinks deployed to Stage on June 11,2015
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
- Move open issues from Redmine to Github – Daniel Done May 21
- Integrating Deploy hooks into Jenkins from github.ncsu.edu
- Met with graduate students CAL15 project initial discussions
- Lark to PHPTek May 18-22, 2015
- Year end performance appraisals moved to 5-27 – Everette
- Student Project on Calendars – Evaluate proposal
- AFNetworking library upgrade for On Campus – In submission
- Dining app features – In submission
- Drupal in Google App Engine – Google Cloud Launcher
- VLC One-Click app Certs and Provisioning – Dan
- Webregistry fix – Generic accounts, groups white screen
- Cyclone cronjob fix – missing access rights
June 4, 2015
In Progress
- GoLinks deploy to Stage on June 2015
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Replace Google resource calendar in Webregistry with database and inators – Lark & Tim
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – test and move to production – on-going
- Decommission Redmine by June 2015 – in-progress need to move stakeholders over to Github teams – Daniel
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks testing with OTF Shib Auth adapter – on-going
- Contact Apple Indoor Navigation – Dan – waiting on response from Apple
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Schedule June Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan after June 9th – Dan
- Drupal Google Authentication research – Daniel
- webFramZ iOS – on-going
- CAL15 research
- Determine if insecure Android apps can be removed from Play store – contact campus developers – Dan
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
Complete
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
- Move open issues from Redmine to Github – Daniel Done May 21
- Integrating Deploy hooks into Jenkins from github.ncsu.edu
- Met with graduate students CAL15 project initial discussions
- Lark to PHPTek May 18-22, 2015
- Year end performance appraisals moved to 5-27 – Everette
- Student Project on Calendars – Evaluate proposal
- AFNetworking library upgrade for On Campus – In submission
- Dining app features – In submission
- Drupal in Google App Engine – Google Cloud Launcher
- VLC One-Click app Certs and Provisioning – Dan
- Webregistry fix – Generic accounts, groups white screen
- Cyclone cronjob fix – missing access rights
May 28, 2015
In Progress
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Replace calendar create with database and inators – Lark & Tim
- Start SC Data Security Classification Wizard (ColorMyData) – in-progress
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication plugin – discuss NCSU Multiauth plugin and test
- System wide software sharing automation – AutoPKG – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Decommission Redmine by June 1, 2015 – in-progress need to move stakeholders over to Github teams – Daniel
- WRAP EOL 2015 – transition apps to Shib and SSL
- GoLinks deploy to Stage on June 2015
- GoLinks testing with OTF Shib Auth adapter – on-going
- AFNetworking library upgrade for On Campus – In submission
- Dining app features – In submission
- Contact Apple Indoor Navigation – Dan
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Schedule June Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working on clean up
- Check with Library about Apple Watch loan after June 9th – Dan
- VLC One-Click app Certs and Provisioning – Dan
- webFramZ iOS – on-going
- CAL15 research
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
Complete
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
- Move open issues from Redmine to Github – Daniel Done May 21
- Integrating Deploy hooks into Jenkins from github.ncsu.edu
- Met with graduate students CAL15 project initial discussions
- Lark to PHPTek May 18-22, 2015
- Year end performance appraisals moved to 5-27 – Everette
- Student Project on Calendars – Evaluate proposal
May 21, 2015
In Progress
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication – on-going
- System wide software sharing automation – AutoPKG – on-going
- Google Directory API Updates for Web Registry – in progress – Lark, Tim – waiting on Tim
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Start SC Data Security Classification Wizard – May 1, 2015 – in-progress
- Decommission Redmine by June 1, 2015 – in-progress
- WRAP EOL 2015 – transition apps to Shib and SSL
- Integrating Deploy hooks into Jenkins from github.ncsu.edu – on-going
- GoLinks deploy to Stage on May 28, 2015
- GoLinks testing with OTF Shib Auth adapter – on-going
- Lark to PHPTek May 18-22, 2015
- AFNetworking library upgrade for On Campus – In submission
- Dining app features – In submission
- Contact Apple Indoor Navigation – Dan
- On Campus Swift rewrite – on going
- WatchKit support for On Campus – Dan – on-going
- Schedule June Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- Year end performance appraisals moved to 5-27 – Everette
- Check with Library about Apple Watch loan after June 9th – Dan
- VLC One-Click app Certs and Provisioning – Dan
- Student Project on Calendars – Evaluate proposal
- webFramZ – initial setup on iOS
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
Complete
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
- Move open issues from Redmine to Github – Daniel Done May 21
May 14, 2015
In Progress
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Move open issues from Redmine to Github – Daniel in progress – May
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- Work on WordPress Shib authentication – on-going
- System wide software sharing automation – AutoPKG – on-going
- Google Directory API Updates for Web Registry – in progress – Lark, Tim – waiting on Tim
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Start SC Data Security Classification Wizard – May 1, 2015 – in-progress
- Decommission Redmine by June 1, 2015 – in-progress
- WRAP EOL 2015 – transition apps to Shib and SSL
- Integrating Deploy hooks into Jenkins from github.ncsu.edu – on-going
- GoLinks deploy to Stage on May 28, 2015
- GoLinks testing with OTF Shib Auth adapter – on-going
- Lark to PHPTek May 18-22, 2015
- AFNetworking library upgrade for On Campus – in-progress
- Contact Apple Indoor Navigation – Dan
- On Campus Swift rewrite – on going
- Dining app features – implementing
- WatchKit support for On Campus – Dan – on-going
- Schedule June Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- Year end performance appraisals – Everette
- Lark on leave Friday 5/15
- Check with Library about Apple Watch loan after June 9th – Dan
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Work with DEO on WordPress test environment for search, code – oit-dev.ncsu.edu – On-Hold
Complete
- Contacted Carrie regarding EOL for Crosswalk – Schedule retirement of Crosswalk Code in August 2015 – Completed
- Purchased GLogin WP Plugin
- Purchased/Setup Jenkins on Google Cloud
- Dan met with Luis re: Social Media plugin activation
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
May 7, 2015
In Progress
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Move open issues from Redmine to Github – Daniel in progress – May
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- System wide software sharing automation – AutoPKG – on-going
- Google Directory API Updates for Web Registry – in progress – Lark, Tim
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Start SC Data Security Classification Wizard – May 1, 2015 – in-progress
- Decommission Redmine by June 1, 2015 – in-progress
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- Integrating Deploy hooks into Jenkins from github.ncsu.edu
- GoLinks stage testing with OTF Shib Auth adapter
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Contact Carrie regarding EOL for Crosswalk – Lark
- Lark to PHPTek May 18-22, 2015
- AFNetworking library upgrade for On Campus – in-progress
- Contact Apple Indoor Navigation – Dan
- On Campus Swift rewrite – on going
- Met with Dining to review app features -complete – starting to implement
- WatchKit support for On Campus – Dan – on-going
- Schedule June Mobile Committee meeting regarding bad apps policy – Dan
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- Year end performance appraisals – Everette
- Lark WFH Friday 5/8
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
Complete
- Everette taught Casper class
- LawnCare Android app review and rejected for deprecated code
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Apple Indoor Positioning at Hunt Library – Data processing complete
- Domain for ncsuwebdev on Google AppEngine verified by Google now developers.ncsu.edu
- Move private Dev tools to private GitHub – in progress – May 14
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
April 30, 2015
In Progress
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Move open issues from Redmine to Github – Daniel in progress – May 6
- Move private Dev tools to private GitHub – in progress – May 14
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- System wide software sharing automation – AutoPKG – on-going
- Google Directory API Updates for Web Registry – in progress – Lark, Tim
- OCC WordPress Theme Buddypress work – Daniel – on-going – Work with Brian
- Start SC Data Security Classification Wizard – May 1, 2015
- Decommission Redmine by June 1, 2015
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- GoLinks stage testing with OTF Shib Auth adapter
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Domain for ncsuwebdev on Google AppEngine verified by Google- waiting on CommTech
- Contact Carrie regarding EOL for Crosswalk – Lark
- Lark to PHPTek May 18-22, 2015
- AFNetworking library upgrade for On Campus
- Apple Indoor Positioning at Hunt Library – Data processing complete
- On Campus Swift rewrite – on going
- Met with Dining to review app features -complete – starting to implement
- WatchKit support for On Campus – Dan – on-going
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- Year end performance appraisals – Everette
On Hold
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
Complete
- Patch NCSU Web Developers WordPress – Lark – complete v2
- Meet with Tim/Sarah on Web Registry Google changes – Done
- Dan and Stan at Mobile App Challenge judging April 28 – finished
- Jenkins and tool set fixes – finished
- Casper JSS server update – Complete
- Met with IES regarding third party app development
April 22, 2015
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes – in progress
- Move open issues from Redmine to Github – Daniel in progress
- Decommission Redmine by May 1, 2015
- Move private Dev tools to private GitHub – in progress
- Start SC Data Security Classification Wizard – May 1, 2015
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- Check Crosswalk regarding auth adaptor or move to ServiceNow – On Hold
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- GoLinks stage testing with OTF Shib Auth adapter
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on hold
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-hold
- iOS iBeacon passbook research and prototype – on-hold
- Set meeting with Tally about iBeacon and OnCampus – On hold with stakeholder (Theo)
- Apple Indoor Positioning at Hunt Library – waiting to hear from Apple regarding data
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- OCC WordPress Theme Buddypress work – Daniel – on-going – Work with Brian
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-hold
- Met with Dining to review app features -complete – starting to implement
- Ask Mobile Committee for guidelines on recalling insecure apps and mobile app profiling – meeting scheduled May 6th
- Patch NCSU Web Developers WordPress – Lark?
- Casper JSS server update – May 6, 2015
- WatchKit support for On Campus – Dan – on-going
- Lark to PHPTek May 18-22, 2015
- Google Directory API Updates for Web Registry – in progress – Lark
- Meet with Tim/Sarah on Web Registry Google changes
- Year end performance appraisals – Everette
- Dan and Stan at Mobile App Challenge judging April 28
April 16, 2015
- OAuth2 module and Webregistry Calendar Resource cron – on hold – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -Testing group restrictions
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes – in progress
- Move open issues from Redmine to Github – Daniel in progress
- Decommission Redmine by May 1, 2015
- Move private Dev tools to private GitHub – in progress
- Start SC Data Security Classification Wizard – May 1, 2015
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- Check Crosswalk regarding auth adaptor or move to ServiceNow
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- GoLinks stage testing with OTF Shib Auth adapter
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury – Dan will contact
- Apple Indoor Positioning re-survey at Hunt Library – complete
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going – working with WCU and EA clean up
- OCC WordPress Theme Buddypress work – Daniel – on-going – Work with Brian
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Met with Dining to review app features
- Notify campus Android developers about PhoneGap vulnerabilities – done
- Ask Mobile Committee for guidelines on recalling insecure apps – meeting scheduled May 6th
- Mobile Committee review – Mobile App profiling – on going
- Teach Casper Packaging class – Everette – Done
- Patch NCSU Web Developers WordPress – Lark
- Casper JSS server update – April 30th
- WatchKit research – Dan
- Lark to PHPTek May 18-22, 2015
- Dan to WWDC June 7-12?? – Pending ticket lottery
April 9, 2015
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access from Tim L.
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes – in progress
- Move open issues from Redmine to Github – Daniel in progress
- Decommission Redmine by May 1, 2015
- Move private Dev tools to private GitHub – in progress
- Start SC Data Security Classification Wizard – May 1, 2015
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- GoLinks stage testing with OTF Shib Auth adapter
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury – Dan will contact
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey in April – complete
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Book flight for PHPTek – Done
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Dining and Wingswept work to verify data feeds – On going
- Submitted new CALS Food Safety app to Apple – approved and live
- Update Google Play store listings for Android Apps – Short Description, Featured graphic, Content Rating – done
- Notify campus Android developers about PhoneGap vulnerabilities – done
- Ask Mobile Committee for guidelines on recalling insecure apps – meeting scheduled May 6th
- Met with Libraries group about indoor positioning efforts – done
- Mobile Committee review – Mobile App profiling – on going
- Teach Casper Packaging class – Everette
- Patch NCSU Web Developers WordPress – Lark
- Casper JSS server update – April 15th
- WatchKit research – Dan
April 1, 2015
- Cyclone Copyright Cronjobs Remedy to ServiceNow conversion – update copyright expires cronjob – done
- Crosswalk Stage Testing – scheduled for production on March 19th – done
- Crosswalk Remedy additional fix to production – April 2
- Ariel Remedy to ServiceNow update – complete
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access from Tim L.
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes – in progress
- Move open issues from Redmine to Github – Daniel in progress
- Decommission Redmine by May 1, 2015
- Move private Dev tools to private GitHub
- Start SC Data Security Classification Wizard – May 1, 2015
- WRAP EOL August 1, 2015 – transition apps to Shib and SSL
- Look at creating OTF auth adaptors for shib & oauth2 – On-going
- GoLinks stage testing with OTF Shib Auth adapter
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey in April
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Book flight for PHPTek – Lark
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Dining and Wingswept work to verify data feeds – On going
- Submitted new CALS Food Safety app to Apple
- Update Google Play store listings for Android Apps – Short Description, Featured graphic, Content Rating
- Notify campus Android developers about PhoneGap vulnerabilities – Dan
- Ask Mobile Committee for guidelines on recalling insecure apps – Dan
- Met with Libraries group about indoor positioning efforts – Dan
- Mobile Committee review – Mobile App profiling
- Teach Casper Packaging class – Everette
- Patch NCSU Web Developers WordPress
March 12, 2015
- Cyclone Copyright Cronjobs Remedy to ServiceNow conversion – update copyright expires cronjob
- Crosswalk Stage Testing – scheduled for production on March 19th
- Ariel Code review for Remedy to ServiceNow Wed Mar 10, 2015 – done will use SOAP
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access from Tim L.
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes
- Move issues from Redmine to Github
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury
- Moving apps to SSL – .htaccess editing – On hold until June 1
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey in March
- Look at creating OTF auth adaptors for shib & oauth2 – On hold
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Book travel for PHPTek – Lark
- GoLinks push to stage (production 1 week after CAB approval) – On hold
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Github issues research – On going
- Dining and Wingswept work to verify data feeds – On going
- Update AppFigure reports distribution for TurfGrass apps – done
- Beta review new CALS Food Safety app – sent back for feedback
- Mobile Committee review – Mobile App profiling
- Teach Casper Introductory class – Everette
- Patch NCSU Web Developers WordPress
March 5, 2015
- Cyclone Copyright Cronjobs Remedy to ServiceNow conversion – finishing up comments and incident closing
- Crosswalk Stage Testing – waiting on Carrie and Chris to review
- Ariel Code review for Remedy to ServiceNow Wed Mar 10, 2015 tentative
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access from Tim L.
- Work on Vagrant shib integration for local development – shib config issues – On hold
- Jenkins and tool set fixes
- Move issues from Redmine to Github
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury
- Moving apps to SSL – .htaccess editing – On hold until June 1
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey
- Look at creating OTF auth adaptors for shib & oauth2 – On hold
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Book hotel and conference for PHPTek – Lark – done
- GoLinks push to stage (production 1 week after CAB approval) – On hold
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Github issues research – On going
- Dining and Wingswept work to verify data feeds – On going
- Updated ot.ncsu.edu web pages
- Update AppFigure reports distribution for TurfGrass apps
- Beta review new CALS Food Safety app
- Mobile Committee review – Mobile App profiling
February 26, 2015
- Cyclone Copyright Cronjobs Remedy to ServiceNow conversion – working on comments and data
- Crosswalk Remedy separation – Done
- Crosswalk Stage Testing – waiting on Carrie and Chris to review
- Ariel Code review for Remedy to ServiceNow Wed Mar 4, 2015 tentative
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access from Tim L.
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- iOS iBeacon passbook research and prototype – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo Kingsbury
- Moving apps to SSL – .htaccess editing – On hold
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey
- Look at creating OTF auth adaptors for shib & oauth2 – On hold
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Work on Vagrant shib integration for local development – shib config issues – On hold
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Book hotel and conference for PHPTek, wait on travel – Lark – to do
- GoLinks push to stage (production 1 week after CAB approval) – On hold
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS) on hold
- Add OCC WordPress theme to OT site – on-going
- Meeting with Leo on Mar. 3 to discuss Security Wizard
- IR Presentation schedule for Co-Working Feb. 20 – Done
- Check billing for Google CloudSQL D0 for Web Developers and Drupal GAE Test – Feb 28, 2015
- Github issues research – On going
- Dining and Wingswept work to verify data feeds – On going
- Casper 9.65 update – done
- CrashPlan added NCSU-CHEM and NCSU-ECE audit account
February 12, 2015
- Cyclone Copyright Cronjobs Remedy to ServiceNow conversion
- Crosswalk Remedy separation
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – On hold
- iBeacon and local notifications – on-going
- Moving apps to SSL – .htaccess editing – On hold
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey
- Look at creating OTF auth adaptors for shib & oauth2 – On hold
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Work on Vagrant shib integration for local development – shib config issues – On hold
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- AutoPKG Work – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo King
- iOS iBeacon passbook research and prototype – on-going
- Book hotel and conference for PHPTek, wait on travel – Lark – to do
- GoLinks push to stage Feb. 12th (tentative production Feb. 19th after CAB approval) – On hold
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS)
- Add OCC WordPress theme to OT site – on-going
- Research Google Code Commit – done
- Meeting with Leo & Payman on Feb. 6 to discuss Security Wizard & IR Presentation – done
- IR Presentation schedule for Co-Working Feb. 20
- Research Google Script for Copyright – Lark – done
- Updated CloudSQL from D1 to D0 for Web Developers and Drupal GAE Test – done
- Github issues research – On going
- Dining and Wingswept work to verify data feeds – On going
- Security lunch and learn – done
February 5, 2015
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- Drupal in Google App Engine – In progress
- iBeacon and local notifications – on-going
- Moving apps to SSL – .htaccess editing – on-going
- Contacted Apple re: Indoor positioning -waiting on Apple for site survey
- Look at creating OTF auth adaptors for shib & oauth2 – on-going
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Work on Vagrant shib integration for local development – shib config issues – on-going
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- AutoPKG Work – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo King
- iOS iBeacon passbook research and prototype – on-going
- Book hotel and conference for PHPTek, wait on travel – Lark – to do
- GoLinks push to stage Feb. 12th (tentative production Feb. 19th after CAB approval)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS)
- Add OCC WordPress theme to OT site – on-going
- Research Google Code Commit – on-going
- Meeting with Leo & Payman on Feb. 6 to discuss Security Wizard & IR Presentation
- Research Google Script for Copyright – Lark
- Updated CloudSQL from D1 to D0 for Web Developers and Drupal GAE Test
- Github issues research
- Dining and Wingswept work to verify data feeds
- Security lunch and learn
January 29, 2015
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- System wide software sharing automation – AutoPKG – on-going
- OIT website – on going
- OT Theme conversion – Daniel – on-going
- Google Endpoint research – continuing
- Drupal in Google App Engine – In progress
- iBeacon and local notifications – on-going
- Updated OT projects page with link and source – Completed
- Moving apps to SSL – .htaccess editing – on-going
- Contacted Apple re: Indoor positioning – est. Feb. 2015 site survey – waiting on Apple
- Install Jenkins plugins for build keep limits and workspace cleanup – Complete
- Look at creating OTF auth adaptors for shib & oauth2 – on-going
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Course data query access from Sherwood – Requested access to more Oracle tables – meeting complete
- Work on Vagrant shib integration for local development – shib config issues – on-going
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going -waiting on GST for group access
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- AutoPKG Work – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo King
- iOS iBeacon passbook research and prototype – on-going
- Book hotel and conference for PHPTek, wait on travel – Lark – to do
- GoLinks push to stage Jan. 30th (tentative production Feb. 4 after CAB approval)
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS)
- OT Theme conversion – Daniel – hold
- OT projects page add descriptions – Daniel -Complete
- Add OCC WordPress theme to OT site – on-going
- Fix Jenkins for GoLinks deployment
- Research Google Code Commit – on-going
- Updated mobile.ncsu.edu content – Done
- Meeting with Leo & Payman on Feb. 6 to discuss Security Wizard & IR Presentation
January 22, 2015
- MLK Holiday
- OAuth2 module and Webregistry Calendar Resource cron – on going – waiting on response from Google
- System wide software sharing automation – AutoPKG
- iOS 8.2 development for OnCampus – Approved and published
- OIT website – on going
- Drupal on GAE (Google App Engine) locally – finished
- OT Theme conversion – Daniel – on-going
- Google Endpoint research – continuing
- WordPress in Google App Engine – OAuth – done
- Drupal in Google App Engine – In progress
- iBeacon and local notifications – on-going
- Updated OT projects page with link and source – Completed, descriptions on-going
- Moving apps to SSL – .htaccess editing – on-going
- Cleaned up Jenkins workspace – complete
- Contacted Apple re: Indoor positioning – est. Feb. 2015 site survey – waiting on Apple
- Travel auth for PHP Tek 2015 – complete
- Install Jenkins plugins for build keep limits and workspace cleanup – on-going
- Look at creating OTF auth adaptors for shib & oauth2 – on-going
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu – on-going
- Course data query access from Sherwood – Requested access to more Oracle tables – meeting scheduled
- Work on Vagrant shib integration for local development – shib config issues – on-going
- WordPress in Google App Engine – OAuth test with Google Apps Login Enterprise – on-going
- On Campus Swift rewrite – on going
- UNC Wide Casper Integration – on-going
- AutoPKG Work – on-going
- OCC WordPress Theme Buddypress work – Daniel – on-going
- Set meeting with Tally about iBeacon and OnCampus – waiting to hear from Theo King
- Dining changes to OnCampus – completed
- iOS passbook research and prototype – on-going
- interim reviews – completed
- Book hotel and conference for PHPTek, wait on travel – Lark – to do
- GoLinks push to stage Jan. 23rd (tentative production Jan. 28th after CAB approval)
- On Campus Swift rewrite – on going
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS)
- OCC WordPress Theme Buddypress work – Daniel – on-going
- OT Theme conversion – Daniel – hold
- OT projects page add descriptions – Daniel – on-going
- Add OCC WordPress theme to OT site – on-going
January 15, 2015
- Previous Week
- OAuth2 module and Webregistry Calendar Resource cron – on going
- System wide software sharing automation – AutoPKG
- iOS 8.1.2 development for OnCampus – submitted for review
- OIT website – on going
- Drupal on GAE (Google App Engine) locally
- OT Theme conversion – Daniel
- Google Endpoint research – continuing
- WordPress in Google App Engine – OAuth – waiting on Everette 1/20
- Drupal in Google App Engine – In progress
- iBeacon and local notifications
- Updated OT projects page with link and source
- Spoke with Charles about moving apps to SSL
- Cleaned up Jenkins workspace
- Contacted Apple re: Indoor positioning – est. Feb. 2015 site survey
- Updated OnCampus analytics year-end summary
- Travel auth for PHP Tek 2015 – waiting on Everette
- Added dining changes into Mobile API
- Next Week
- Install Jenkins plugins for build keep limits and workspace cleanup
- Look at creating OTF auth adaptors for shib & oauth2
- Move apps to SSL using htaccess
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu
- Course data query access from Sherwood – Requested access to more Oracle tables – schedule meeting – Dan
- Schedule Security Wizard meeting with Leo – Lark
- OAuth2 module and Webregistry Calendar Resource cron – on going
- Work on Vagrant shib integration for local development – shib config issues
- WordPress in Google App Engine – OAuth test with Google Apps Login Premium
- iOS8.2 On Campus Go Live – when approved by Apple
- On Campus Swift rewrite – on going
- GoLinks push to stage Jan. 15th (tentative production Jan. 20th after CAB approval)
- Indoor Navigation research – waiting on Apple
- Google Endpoint development – continuing (with NCSU CollegiateLink RSS)
- UNC Wide Casper Integration
- AutoPKG Work
- NCSU & OCC WordPress Theme Buddypress work – Daniel
- iBeacon and local notifications
- phptek registration flights and hotel – awaiting on Travel auth approval
- Add OCC WordPress theme to OT site
- Set meeting with Tally about iBeacon and OnCampus
- Dining changes to OnCampus
- OT projects page add descriptions – Daniel
January 8, 2015
- Previous Week
- Christmas break
- OAuth2 module and Webregistry Calendar Resource cron – working on resolution – on going
- System wide software sharing automation – AutoPKG
- iOS 8.1.2 development for OnCampus – submitted for review
- Reviewed course data query suggestions from Jonathan – Requested access to more Oracle tables – waiting until January
- Crosswalk to Remedy sync issue – on going
- OIT website – on going
- Security Wizard – after the holidays
- Drupal on GAE (Google App Engine) locally
- OT Theme conversion – Daniel
- Security Technical position interviews – Everette
- Hosted TestFlight setup and evaluation
- Google Endpoint research
- Work with DEO on WordPress test environment for search, shib, code – oit-dev.ncsu.edu
- WordPress in Google App Engine – Working on authentication – OAuth
- Drupal in Google App Engine – In progress
- GIS Survey for University architects – complete
- iBeacon and local notifications
- Next Week
- Work on Vagrant shib integration for local development
- SSL conversion for all apps (port 80 redirection / check port redirection)
- OAuth2 module and Webregistry Calendar Resource cron – on going
- Update OT projects page with links to apps and repos – Daniel
- Security wizard meeting – after holidays
- Work on Vagrant shib integration for local development – shib config issues
- Drupal & WordPress test environments work on search, shib, OAuth, and themes
- WordPress in Google App Engine – OAuth test with Google Apps Login Premium
- iOS8.2 On Campus Go Live Jan. 15th
- iOS8.2 On Campus work
- GoLinks push to stage Jan. 15th (tentative production Jan. 20th after CAB approval)
- Indoor Navigation research – waiting on Apple
- mobile api courses feed – waiting for Sherwood after holidays
- Google Endpoint api proof of concept “hello world!”
- NCSU CollegiateLink RSS Feed as Google Endpoint POC
- UNC Wide Casper Integration
- AutoPKG Work
- NCSU & OCC WordPress Theme Buddypress work – Daniel
- iBeacon and local notifications
- iBeacon and Casper training videos
- OAuth on Mobile
- phptek registration flights and hotel
- Add OCC WordPress theme to OT site